Kalamazoo Metro - Passenger, Windscreen and Bike Storage Shelter Installation
90900-028.0-bid document(PDF, 2MB)
90900-028.0-Attachment A Windwall Assembly(PDF, 715KB)
90900-028.0-Attachment B Standard Parachute Instructions(PDF, 314KB)
SCOPE OF WORK
The Central County Transportation Authority has purchased 3 prefabricated Bus shelters, 3 windscreens and 1 bike storage shelter with bike racks. The Contractor shall install the bus shelters, windscreens and bike shelter AT ROOD HALL WMU CAMPUS in accordance with all project documents. These include, but are not limited to, the following:
These Specifications
• Attachment A - Windwall Assembly
• Attachment B - Standard Parachute Instructions
TIMELINE
The project must be completed by: 30 days after award. If you cannot meet this deadline, please fill out the “Statement of No Bid” form included in this packet, stating this as the reason.
Additional Info
Type : RFP